1 thought on “Chief Nuclear Engineer Arnie Gundersen: Newly Released TEPCO Data Provides Evidence of Periodic Chain Reaction at Fukushima Unit 1”

  1. I have worked on a hydro dam powering turbine generators
    Stop logs 18″ x18″X20′ also called drops were dropped
    in place,then the steel gate was lowered.There was always
    water leaking through.To stop the leaks,we would dump
    coal cinders taken from a coal firered boiler and dump them
    in the high water side of the dam inline with the leakes.
    It would stop the leaks in very little time.
    I am almost 100% sure that this procedure would stop the
    leakes and,
    .this would give you time to pour cement again
    and plug the leak at the FUKUSHIMA DAINI NUCLEAR
    POWER STATION.

    .